Polyaspartic Polyurea Technical ArticlesWhat Are the Advantages of Polyaspartic Polyurea for Roof Refurbishment? Concrete Roof and Existing Tiled Terrace Procedures
Polyaspartic polyurea is used for roof renovation. It can form a continuous waterproof membrane on qualified substrate, and arrange a more compact recoating process according to the specific model and construction conditions. For concrete roofs, the focus is to deal with looseness, cracks, moisture and water accumulation. For old tiled terraces, it is necessary to first verify whether the brick surface and underlying structure can be preserved. This article explains the two types of solutions based on their advantages, applicable prerequisites, construction control and acceptance inspection. Taking the leakage at the balcony door as an example, it explains when less demolition can be done, when it should be demolished partially or in pieces, and how to compare quotes based on the complete construction scope. Readers can use this to check the start-up conditions, model selection and completion acceptance inspection items, and distinguish between the first-pass substrate sealing of concrete and the coating method of the old tiled terrace.
Article contents (12 sections)
What polyaspartic polyurea can bring to both types of roof renovations
The main advantage of polyaspartic polyurea for roof renovation is that it can be liquid-coated on a qualified substrate surface to form a continuous waterproof membrane, which can easily connect the edges, pipe roots and drainage outlets. Concrete roofs can use this method to gradually process the substrate and details. If the original paving of the old tiled terrace is firm, the underlying structure is stable, and the drainage details are in place, there is a chance to retain most of the paving and reduce demolition and removal. Both solutions require verification of the compatibility of the substrate with the primer coat, waterproof main layer and compatible system surface layer. [1][2][3]
The advantage of concrete roofs is that they facilitate the handling of complex details
Film formation polyaspartic polyurea can be constructed continuously around equipment foundations, parapet corners and through-roof pipes, making it easy to connect additional details to the main surface. Some products can reach overcoating status quickly under specified conditions, and are suitable for projects that require multiple continuous processes. Both the European Organization for Technical Assessment's roofing documents and the Spanish Institute of Building Research's actual assessment evaluate liquid roof waterproofing systems by specific kit and substrate. The construction schedule is still based on the specified model, on-site temperature and humidity, and the recoating requirements of each layer. [2][3]
What conditions must be met before concrete roof construction can begin?
First determine whether the concrete is solid and clean, whether the repair is firm, and whether the moisture content meets the requirements of the selected system. Even when no water is visible on the surface, moisture may remain inside the concrete slab. Old paint, oil stains, surface dusting layers and loose repair materials should be treated to stabilize the substrate surface. Water accumulation caused by insufficient slope, blocked drain outlet or local reverse slope should be resolved before coating. The film thickness is determined by the waterproofing design, and the drainage slope is determined by the substrate or structural treatment. [1]
Cracks should be treated according to their nature. Stable surface cracks can be repaired as designed. Structural cracks, cracks that continue to open and close, and deformation joints need to first identify the source of deformation and detailed structure. If there is water in the wall, equipment pipes or threshold above, check the water ingress path first. The location of indoor dripping water is often the place where the water finally comes out. It is easy to miss the actual entrance just by demarcating the construction area by dripping dots.
How to construct concrete ground floor, main floor and details
Repair, clean and conduct site trials according to approved plans. Use site trial to check primer coat wetting, pinholes in concrete pores and inter-layer compatibility. Formal construction records substrate temperature, humidity, mixing batch and time of each pass. The drainage outlet, parapet root, roof pipe root and end should be processed in detail and necessary additional enhancements according to the details diagram. The main surface construction controls the amount of each pass and the designed dry film thickness, and connects it within the specified overcoating window. After reaching the curing state required by the project, it will then enter the water test or delivery. [1][2]
For the first penetrating sealing coat on a Gaodun concrete roof, add the specified compatible thinner at 20%–30% of the total weight of mixed Parts A and B. For example, 10 kg of mixed Parts A and B requires 2–3 kg of thinner for the first coat to penetrate and seal the concrete capillary pores. Use the A/B ratio on the supply label for the selected product. For the second and third coats, prepare fresh batches at the specified product ratio without adding extra thinner. Existing tiled terraces follow the tile-substrate procedure.
How to accept inspection of concrete roof
First check the details and each construction record before covering, and then check the thickness and completeness of the film formation. Focus on checking for pinholes, missed coatings, bubbles, cracks and ends. The spot inspection locations should cover the main surface and high-risk areas. Areas where dry film can be measured shall be randomly inspected according to approved methods. Details that are difficult to measure directly must be pre-arranged for site trials or process records. After completion, select the appropriate waterproof inspection method according to the design and current specifications, and record the actual drainage, observation area and results. [1]
What are the advantages of retaining old tiled terrace paving?
When the old tiles are retained, demolition and removal can be reduced. The brick surface, caulking and lower adhesive layer should be confirmed layer by layer, and compatibility and adhesion samples should be made based on the actual brick surface. EAD gives the kit evaluation method; Appendix 1 of ETA 24/1247 quoted in the text lists the conditions for concrete, steel, polyurethane foam and asphalt membranes for which the kit is evaluated. Old ceramic tiles need to be verified separately. [2][3]
What conditions must old tiles meet to be retained?
The terrace that can be retained can be considered. The overall tiles should be firmly laid, local defects can be repaired, there is no continuous water storage or structural instability under the tiles that need to be opened and identified, and the drainage slope, threshold, and drain outlet closing conditions are suitable for modification. The scene should be combined with inspection, knocking and necessary local inspection and judgment. Small hollow-sounding areas or loose bricks are usually partially removed and repaired first. When there are extensive hollow-sounding areas, persistent water accumulation, long-term moisture in the lower part, obvious displacement, or drainage details cannot be redone from the surface, the relevant structures should be treated first and dismantled in pieces if necessary.
Before retaining existing tiles, inspect the glaze and check for wax, oil, silicone residue and previous coatings. Confirm that the tiles are sound, then clean and prepare them as specified for the selected system. Do all retained tiles need a primer? Follow the selected coating system’s primer requirements and verify adhesion on a site test patch. The site trial should cover the brick surface, brick joints and repair junctions at the same time. The fact that the brick surface is stuck and the seams are coming apart indicates that the construction plan of this site trial still needs to be adjusted.
How to construct and acceptance inspection of old ceramic tiles
Remove loose caulking and unstable materials, smooth out local demolition areas, and retain and correctly handle joints that need to continue to deform according to their purpose. Prepare smooth tiles as specified for the selected coating, remove dust and verify adhesion of the proposed system on the actual tile surface. Where the system documentation calls for a primer, use one compatible with the tiles and the primary waterproofing layer. Thresholds, wall roots, drain openings and the interface between the original bricks and the repair layer should be inspected separately. For daily walking on the terrace, the wet anti-slip, wear-resistant and maintenance methods of the surface layer should also be agreed upon. [1][2]
During the acceptance inspection, first check the retention area, demolition area, details structure and site trial records, and then check the continuity, edge closing and drainage of the finished membrane. If the contract requires a field adhesion check, use a location chosen in advance, record the layer where failure occurs, and repair the test area afterwards. The waterproof inspection qualification indicates the results under corresponding conditions. Access, anti-skid and maintainability should be checked separately according to use. [1]
How to choose models and compare prices between two types of substrate surfaces
For primary waterproofing on concrete or tiled roofs and terraces, prefer N300 for prolonged outdoor exposure. Consider N700 for standard weathering requirements. Before retaining old tiles, check for hollow areas, loose tiles and contamination. Prepare a sound, clean, dry surface and verify adhesion of the proposed system on a trial area. Gaodun's public product page lists the relevant applicable substrate surfaces of the two products. The selection of compatible systems for actual projects depends on substrate processing, inter-layer compatibility, exposure methods and traffic requirements. [4][5]
| comparison item | concrete roof | Old tiled terrace |
|---|---|---|
| On-site verification | substrate strength, moisture, cracks, slope and details | hollow-sounding areas, water under bricks, glazed surfaces, brick joints, thresholds and drains |
| Quotation items | Cleaning and repairing, substrate sealing, details addition, waterproof main layer, necessary protective layer and inspection | Inspection and inspection, partial or complete brick removal, surface treatment, primer coat, main layer, traffic surface layer and inspection |
| delivery basis | Each construction record, dry film control, details record and waterproof inspection | Brick retention range, site trial, brick joint and edge treatment, waterproof inspection and traffic requirements |
When comparing quotations, all parties are required to clarify which substrate problems have been priced, which ones will be charged separately after they are discovered, and whether details, anti-slip surface and acceptance inspection are included. Only if the two quotations cover the same construction scope, the cost per unit area can be directly compared.
The quotation for leaving bricks should also state how to adjust the scope after inspection. When local looseness is found, the construction party should mark the demolition boundary and record the status of the substrate after repairs are completed. When problems with the drainage structure are discovered, the scope of detailed redoing should be determined first, and then the additional costs should be calculated. This way, when the owner signs the contract, they can clearly see the savings from retaining the pavement and which restoration projects are subject to on-site inspection.
Example | Can water seepage at the terrace door be prevented without tile removal?
Assuming that only indoor watermarks appear near the threshold of the balcony, inspection reveals loose bricks near the drain. The door frame and wall base openings should be checked first, and the surrounding area of the drain outlet should be partially opened to verify moisture and drainage under the bricks. If the main surface is stable and the source of water accumulation has been eliminated, you can consider retaining the remaining tiles after partial demolition, and use a site trial at the interface between the tile surface and the repair layer to confirm the compatible system. If the inspection reveals that water has been retained for a long time and is accompanied by hollow-sounding areas, the damaged substrate and drainage should be restored first, and then the new waterproofing range should be determined. The difference between the two approaches depends on the state of the existing structure.
Conclusion | Determine the substrate and details first, then determine the coating
The decision-making focus of concrete roofs is substrate repair, water content and details. For old tiled terraces, first determine whether the bricks and underlying structure are worth retaining. Only by writing down the demolition boundary, drainage treatment, design film thickness, traffic conditions and acceptance inspection method into the construction scope before signing the contract can the advantages of continuous construction of liquid waterproofing membrane or reduction of demolition be realized.
References
[1] Ministry of Housing and Urban-Rural Development of the People's Republic of China: "General Specifications for Waterproofing of Buildings and Municipal Engineering Projects", GB 55030-2022, effective from April 1, 2023. Check the relevant chapters on roof waterproofing, construction and acceptance inspection. Access date: 2026-11-06. Source (mohurd.gov.cn) Source (ebook.chinabuilding.com.cn)
[2] European Organization for Technology Assessment (EOTA): "Liquid Applied Roof Waterproofing Kits", EAD 030350-00-0402, August 2018, EOTA ©2020. Access date: 2026-11-06. Source (eota.eu)
[3] Spanish Eduardo Toroja Institute of Construction Sciences (IETcc-CSIC): "European Technical Assessment ETA 24/1247 — Neoproof Polyurea R", 2025-07-20, 1st edition. For checking the scope of a specific package and its substrate, see Section 1, Section 2 and Appendix 1. Access date: 2026-11-06. Source PDF (dit.ietcc.csic.es)
[4] Shenzhen Gaodun New Materials Co., Ltd.: "Gaodun polyaspartic polyurea waterproof coating N300", official website product page, the page is not marked with a version date. Access date: 2026-11-06. Source (gao-dun.com)
[5] Shenzhen Gaodun New Materials Co., Ltd.: "Gaodun polyaspartic polyurea waterproof coating N700", official website product page, the page is not marked with a version date. Access date: 2026-11-06. Source (gao-dun.com)