Polyaspartic Polyurea Technical ArticlesHow Is the Gaodun N600 Flake Flooring Body Coat Applied? Full Broadcasting, Loose Flake Removal and Pre-Topcoat Inspection
Gaodun N600 decorative flake flooring uses N600 substrate sealing on qualified concrete. After the substrate sealing reaches the recoating conditions, N600 is used as body coat, and full broadcasting of decorative flakes is applied on the body coat wet film. After the decorative flakes are fixed, recycle excess flakes, trim and vacuum them, and then do N200 clear topcoat after passing the inspection. This article explains the on-site practices focusing on the timing of sprinkling, partition connection, firmness, and pre-topcoat inspection. It also provides work suspension and review methods when the bottom is exposed, stacked, dropped, and partially sticky. Owners and construction leaders can check site trial, batch and process records based on this to distinguish which defects can be corrected in the current process and which ones need to be processed first before entering the topcoat. For door, wall and partition connections, the guide also lists the inspection sequence and on-site records that should be kept to facilitate shift changes and local re-inspections.
Article contents (11 sections)
When to broadcast flakes into the N600 midcoat and when to apply the N200 topcoat
On the concrete floor where the substrate has been accepted and N600 substrate sealing meets the recoating conditions, N600 is used as the body coat, and the body coat wet film is still within the spreading window confirmed by the system documentation or site trial for full broadcasting of decorative flakes. After the decorative flakes are fixed, recover the loose excess flakes, trim the protruding edges and vacuum up the remaining debris. After passing the inspection, do the N200 clear topcoat. The body coat has lost its ability to stick to flakes, has cured abnormally, or flakes have fallen off during loose flake removal. You should first stop and find out the cause. Gaodun's public product page lists the N600 floor usage and N200 clear topcoat positioning respectively. [1][2]
Before starting work | substrate sealing, ingredients and spreading should be connected continuously in the same area
During the N600 substrate sealing acceptance inspection, first confirm that the intended construction area is dry and clean, and that the substrate sealing layer is free of stickiness, contamination, accumulation or repeated bubbling that will affect subsequent coating. The condition of wall bases, doorways, drains and repair areas should be checked separately. If the recoating window specified in the applicable documents has been exceeded, first confirm the interface processing method and review the site trial. Areas where the substrate continues to have recurring dampness or cracks are still active, suspend entry into the body coat.
Check the batch and ratio of the two components of N600 body coat, the color and batch combination of decorative flakes, and the version of N200 topcoat. The construction leader organizes the ingredients according to the technical data sheet (TDS), safety data sheet (SDS) and site conditions. When scheduling, batching, coating and spreading are regarded as three tasks in the same continuous operation area. If the surface temperatures of the shaded area and the sunny area are obviously different, you can try it out in separate areas to confirm the areas that can be spread in time.
The same set of materials and actual construction tools should be used to start the site trial, covering at least a representative main surface and edges. For projects that are planned to be constructed according to natural boundary zoning, you can first conduct an edge connection in the site trial. After the site trial reaches a suitable state, it is agreed to observe the light and distance, and confirm the decorative flakes coverage, texture, edge and topcoat effects. If the batch combination of decorative flakes is changed during construction, the body coat method is changed, or another topcoat compatible system is used, the site trial representativeness should be re-evaluated.
Body coat and spreading | Separate the construction area first, and then start mixing
Mix N600 according to the confirmed ratio, and apply the body coat evenly according to the project process. For each batch, record the separate weights of Parts A and B, the mixing start time, the application area and the time flake broadcasting was completed. The ingredients of the body coat should be independently checked according to the body coat technical documents; if the construction viscosity needs to be adjusted, the compatible thinner and addition standard approved for the process should be confirmed first. Check the actual amount of body coat according to the partition area, and check the coating continuity, corner coverage and stacking. If the midcoat has missed spots, is contaminated or has begun to gel locally, stop broadcasting flakes in that area. Follow the project repair procedure before resuming.
Decorative flakes should be sprinkled on an acceptable wet film of N600 body coat, subject to approved site trial full broadcasting. Each area starts from the arranged position, cooperates with the construction staff to exit the route, and takes care of the walls, corners, thresholds and partition lines. The person in charge of the construction shall record the start time of coating and spreading, and check whether there are obvious bottom exposures, concentrated piles of chips and strips. The goal of full broadcasting is to provide even coverage and leave excess flakes that can be recycled. The actual fixation degree of decorative flakes should be checked after the body coat reaches a state where loose flakes can be removed.
It is advisable to determine the location of corners, thresholds or other natural boundaries in advance. If it is interrupted due to weather or personnel arrangements, record the last completed location and completion time of each course. When continuing, first check the curing, adhesion and contamination conditions of the original boundary, and then handle the overlap according to the approved plan. Where the midcoat is no longer tacky enough to hold the flakes, agree on the repair procedure and reinspect the area before broadcasting flakes again.
Main surface construction | How to avoid leakage and strips in new and old batches
When preparing materials, first check the batches and color combinations of decorative flakes approved for use in the site trial, and label the materials used in each area in order. If the project plan mixes multiple batches, the combination used in the site trial should be confirmed first, and then allocated according to the construction records. Corners and thresholds are often blocked, so a review can be arranged before the film spreader exits. The focus of the inspection is whether there is an obvious color or coverage difference between the edge of the construction area and the main surface, and mark the abnormal area on the map. When it is found that the wet film is still in a spreadable state, it shall be repaired according to the plan; the area beyond the window shall be handed over to the construction leader to determine the repair method.
Area and materials should be recorded separately. Body coat is recorded according to net usage and actual coating area. Decorative flakes can be recorded separately for usage, recyclable excess flakes and cleaning loss. Whether excess flakes can continue to be used should be determined according to project regulations. Keep excess flakes stained with dust, wet materials or mixed with different colors separately to avoid returning to the materials to be spread. In this way, the color difference in a certain area can be traced, and it is also convenient to check whether the succession occurs at the position of batch change.
Recycling excess flakes | The fixed decorative flakes are checked before topcoat
After reaching the loose flake removal state allowed by the compatible system process, the unglued decorative flakes are recovered according to the method determined by the site trial. During loose flake removal, observe whether the surface excess flakes fall off or are brought up together with the lower film layer. Slightly local protrusions can be repaired according to site trial requirements, and dust and debris should be sucked away after treatment. Inner corners, door edges and construction joints are prone to flakes, so they should be inspected one by one. If the fixed decorative flakes are repeatedly brought up during cleaning, large areas of bottom are exposed, or the body coat is sticky, the topcoat should be stopped and the abnormal range should be recorded.
After loose flake removal, check the color, coverage and highlighted edges under the agreed light and distance. If the project agrees on thickness measurement, first determine which layer to measure, when to measure and how to take the points. ISO 2808:2019 Public Summary Description Appendix B deals with thickness measurement of rough surfaces. The decorative flakes layer has fluctuations. The specific methods and criteria should be selected based on the actual substrate and surface conditions, and confirmed on site trial. [3]
Release before topcoat | How to judge whether loose flake removal is normal or coating is unstable
What is normally recycled after loose flake removal are excess flakes that are not embedded in the body coat. If the cleaning process brings up decorative flakes that are connected together and expose the support layer or lower interface, the topcoat in this area should be stopped. Observe the exposed bottom surface during re-inspection. If only decorative flakes are seen partially falling off but the body coat is still intact, review the status of the flakes and body coat. If the body coat curls up along with the decorative flakes, the interface between the body coat and substrate sealing should be investigated. If the concrete surface powder detaches with the diaphragm, the firmness of the substrate and handling records need to be checked. On-site phenomena are used to determine the direction of investigation, and if necessary, inspections are carried out according to the project plan.
When releasing, the main surface, edge and repair area can be signed separately. Record the completion time of loose flake removal, vacuuming conditions, photos of the edges, repair locations and review conclusions. If there is rainfall, dust or other types of work entering the work area after the inspection is completed, re-check the dryness and cleanliness status before topcoating. The original area number will be used for each re-inspection, making it easier to match the topcoat appearance with construction records during subsequent acceptance inspections.
N200 topcoat | Continue only after the decorative flakes layer check passes
After the construction leader signs the loose flake removal record, the N200 clear topcoat will be constructed according to the confirmed compatible system document. During construction, check whether the main surface, edges and joints are continuous, and pay attention to local piles, pinholes, whitening and protruding edges. If the project has anti-skid requirements, the approved site trial and actual wet acceptance criteria shall prevail. When encountering dew, rainfall contamination, or topcoat significantly changing the intended texture, first stop in the affected construction area and clearly record the abnormal location.
After the topcoat is completed, isolate and protect the site. The delivery record should list the completion time of the last N200, temperature and humidity during curing, rainfall or water exposure, and inspection results. Confirm the opening conditions for walking, placing furniture, cleaning and other uses according to the compatible system document and project acceptance inspection respectively, and indicate the reviewer and release time. The delivery plan diagram indicates the batch of decorative flakes, repair locations and partition lines to facilitate review of materials and construction time when subsequent appearance changes occur.
Simulation site | The same courtyard walkway, why do pieces fall off on the next side?
A long walkway was constructed in two phases. During loose flake removal, I found that a section of decorative flakes adjacent to the door fell off with just a swipe. The person in charge of the construction first listed this section as a pause area, recorded the boundary and extent of flake loss, and then compared the coating and spreading time, substrate status and mixing records of the two areas before and after. If the falling pieces are concentrated in the area where the body coat has begun to lose the ability to stick to the pieces, the section should be processed according to the method confirmed by the project and a new sample should be made. If the decorative flakes leave the substrate together with the body coat, further check the substrate sealing and concrete interface. After repair, review the adhesion, covering and edge jointing. If the requirements are met, topcoat will be done uniformly.
This situation also shows that there are two types of scenes that should be taken when saving photos. The first picture shows the entire construction area and the edge location, and the second picture shows a close-up view of the anomaly after loose flake removal. By recording the day's processes and material batches, it can help the next shift of staff determine where to resume work and which layer to process first.
Rework boundary | After partial repair, check the continuity
The delineated repair area should include the defect itself and the edges that can form a stable connection. If you want to partially redo the body coat and scatter flakes, first confirm the status and compatible practices of the surrounding cured coating. After completion, recheck the fixation of decorative flakes and edge height differences. For the same main channel, the repair sample must meet the coverage and texture requirements of the approved site trial before proceeding, so that the owner and the construction party can jointly confirm the acceptable edge effect.
Checklist before body coat, spreading and topcoat
| Check time point | What to look at | Pause or review conditions |
|---|---|---|
| N600 before body coat | N600 substrate sealing status, substrate and overcoating conditions | Continuously recurring dampness, substrate sealing anomaly or recoating window to be confirmed |
| full broadcasting | N600 wet film status, coverage and zone connection | The body coat has insufficient adhesion ability, or the bottom is obviously exposed and the flakes are piled up. |
| After loose flake removal | Decorative flakes fixation, debris and dust, edges and site trial | The body coat is sticky, falling off in pieces, and the edges are not confirmed |
| N200 before topcoat | loose flake removal acceptance inspection records, construction window and on-site weather | Acceptance inspection is not signed, surface condensation or contamination |
| Before delivery | Appearance, drainage, wet use requirements and opening conditions | The defect has not been dealt with, or the corresponding usage conditions have not been met. |
References
[1] Shenzhen Gaodun New Materials Co., Ltd.: "Gaodun polyaspartic polyurea floor N-600", official product page, no version date marked. For product verification and disclosure purposes. Access date: 2026-11-06. Source (gao-dun.com)