When refurbishing exposed structural steel with Gaodun N500, first assess the service environment, adhesion of the existing paint and condition of the steel. Follow the project specification for cleaning and rust removal, the compatible primer, treatment of welds and edges, and the N500 anticorrosive topcoat. Where paint is peeling, rust is spreading or compatibility is uncertain, mark the affected areas and test a representative patch. This guide explains when paint can be retained, how to release prepared steel for coating, when to overcoat the primer and how to verify dry film thickness. It includes a start-up and acceptance checklist for owners, purchasers and application supervisors reviewing quotations, material requirements and handover records. The example concerns existing carbon steel in atmospheric exposure. Areas frequently exposed to seawater splash, prolonged immersion or specific chemicals require separate confirmation of the complete coating system.

Article contents (11 sections)

Applying Gaodun N500 to existing structural steel

For existing carbon steel exposed to the atmosphere, first mark where existing paint will be retained or removed. Clean the steel, remove rust and prepare details such as welds and edges. Apply the specified primer and N500 anticorrosive topcoat, then inspect the finish, measure dry film thickness and verify touch-ups. Stop coating affected areas if paint is peeling, rust is spreading, steel is visibly thinning or condensation persists. Follow the project coating system specification for the primer and N500 application sequence. The coating plan should identify the primer and specify the thickness of each coat and the recoating conditions. [1][2]

Service environment and condition of the steel

This guide covers maintenance painting of exposed structural steel on industrial buildings, equipment supports and similar exterior carbon-steel surfaces. Record whether each component is outdoors or sheltered, whether condensation occurs frequently and whether it is subject to persistent salt deposition, wash water or process chemicals. ISO 12944-2 distinguishes atmospheric exposure from immersion and other service conditions. At coastal facilities, assess the upper, atmospherically exposed section separately from lower sections exposed to splash or prolonged wetting. Tank interiors, seawater immersion and exposure to specific chemicals require separate project verification. [3]

Inspect the steel section, welds and connections. If there is significant section loss, perforation, cracking, deformation or a weld defect, the project's technical lead should determine whether the component remains fit for service and whether it needs repair. Agree the extent of coating work together with the extent of structural repairs.

When can existing paint on structural steel be retained beneath N500?

Retain existing paint beneath N500 on atmospherically exposed carbon steel only if the paint is firmly bonded, corrosion is not spreading beneath it, and a site test patch confirms compatibility and adhesion. Remove loose or peeling paint and coatings over spreading rust. Clean and prepare the exposed steel and the edges of the retained paint. Apply the specified primer and N500 topcoat across retained paint, bare steel and their junction. Check for softening, wrinkling or lifting and verify adhesion against the project acceptance criteria. Once the patch is accepted, coat the remaining area and check dry film thickness against the project coating specification. [1][2]

Table 1
Site condition Gaodun's recommended next step What to verify before coating
Existing paint is sound, with no visible spread of corrosion Mark the areas proposed for retention, clean them and apply the proposed system to a test patch Check the integrity of the existing paint, compatibility between old and new coatings, and cure
Local peeling, exposed steel or rust Remove the failed coating, inspect the surrounding area and prepare the edges of the remaining paint Exposed steel meets the specified preparation requirements and remaining paint edges are sound
Widespread flaking or corrosion spreading beneath the coating Extend the inspection and reassess how much coating to remove The technical lead confirms the preparation and acceptance criteria
Existing coating is unidentified or the test patch causes lifting or wrinkling Hold further application and review the existing and proposed coating systems Revise the isolation or removal procedure and repeat the test patch

The test patch should cover the existing paint proposed for retention, the bare-steel repair area and the transition between them. Include a weld or bolt where practicable. Under the agreed conditions, check for softening, wrinkling, lifting at the edges or intercoat separation. If pull-off testing is specified, agree the method, acceptance criteria and test locations in advance, and record where failure occurs. If the adhesive securing the dolly fails first, the reading identifies that failure and cannot establish the actual coating-to-steel adhesion strength. Repair the test locations using the specified system. ASTM D4541-22 scope (store.astm.org)

Select the visual assessment criteria for the extent of coating removal. For localized removal with some existing coating retained, refer to the preparation grades in ISO 8501-2. [4][5] For uncoated steel or steel after complete coating removal, the project may specify ISO 8501-1. Inspect visible imperfections at welds and edges separately under ISO 8501-3:2025 where applicable. Identify the area, preparation method and agreed grade in the work instructions. Record any project-required results for surface roughness, dust and soluble salts separately. ISO 8501-1 summary (iso.org) ISO 8501-3 summary (iso.org)

Specifying the primer and N500 on the same work order

The public N500 technical data sheet (TDS) calls for selection of the anticorrosive system according to the project environment, surface preparation and primer/topcoat combination, followed by a small-area compatibility and adhesion check before application. When ordering, confirm the exact primer product, suitable steel surface, conditions for recoating with N500 and applicable project specification revision. Resolve descriptions such as “galvanizing primer” to a specific product and verify compatibility. Identify separate treatments or coating systems on the work order if retained paint and exposed steel require different procedures. [2]

Verify the N500 mixing ratio and basis of measurement against the supplied product label and applicable batch documentation. Before opening the containers, check the label, batch and document revision. Resolve any mismatch before mixing. Specify the quantity per mix, pot life and recoating conditions on the work order. Select airless spray, roller or brush application according to the technical documents and site conditions. Follow the safety data sheets for the materials supplied and the project application plan for protective measures, ventilation and equipment. [2]

Resuming work after condensation or a missed recoat window

ISO 8502-4:2017 provides guidance on assessing condensation risk before coating. [8] Record air temperature, relative humidity, the dew point determined from them and the measured steel surface temperature. Subtract the dew point from the surface temperature. For example, steel at 24 °C and a dew point of 22 °C give a margin of 2 °C. Check that margin and the temperature and humidity against both the project specification and the technical documents for the primer and topcoat before deciding whether to start. Take separate measurements on components near cold pipes and in persistent shade. Record locations, times and repeat measurements after weather changes.

Reinspect prepared steel after overnight exposure, rain or contamination from other operations. If rust reappears, assess the surface again against the original preparation grade. ISO 12944-7:2017 requires observance of the intervals between coats and between the final coat and entry into service specified in the product documents or project specification. [6] For each component, record when the preceding coat was completed, the temperature at that time and the applicable recoat window. If the minimum interval has not elapsed, wait and recheck the film. If the maximum interval has passed, hold recoating. The application supervisor should consult the system documentation to determine whether cleaning, abrasion or a trial application is required, then record the area treated, inspection findings and release time before work resumes.

Application and inspection of each coat

1. Clean the steel, remove rust and prepare edges. Remove oil, failed paint, rust and dust as specified in the approved plan. Inspect welds, sharp edges, bolt bases, lower edges and transitions to retained paint. [4][5] If the project specifies ISO 8502-3:2017, pressure-sensitive tape can be used for a qualitative assessment of residual dust on cleaned steel. Record dust quantity rating and particle size class separately. Confirm that the test applies to the surface condition and assess the findings against the project limits. Link each tape record to the component, test location and time. If rust, contamination or condensation recurs, restore the specified surface condition and repeat the inspection. ISO 8502-3 summary (iso.org)

2. Apply the specified primer. Once the prepared steel is released for coating, apply the primer according to its technical documents. Record time, batch and environmental conditions. ISO 12944-7:2017 calls for particular attention to hard-to-coat areas such as edges, corners, welds and bolted joints. Use a stripe coat where extra edge protection is required. [6] A stripe coat adds local coverage where the film tends to be thin. Specify its location, material, tools and timing relative to the full coat. Observe the approved number of coats and recoating conditions. Check the primer for missed areas, sagging, wrinkling and readiness to recoat. Agree on corrective action before proceeding if contamination, an expired recoat window or an abnormal interface on the test patch is found. [2][6]

3. Apply the N500 anticorrosive topcoat by area. Use the number of coats and film thickness specified for the project system. Weigh and mix the components accurately. Plan work areas, batches and overlap locations, then control the quantity mixed each time. Inspect each coat for show-through, pinholes, blistering, sagging and visible dry spray. Discard mixed material once its pot life has expired. Before the next coat, recheck the film, environmental conditions and recoat window. Link the actual start and finish times for each area to the component identifier. [2][6]

4. Repair and reinspect. After handling, assembly or masking removal, inspect ends, joints, fasteners and other potentially damaged areas. Prepare and touch up each area using the specified system. Record its condition before and after repair, the method, materials and reinspection findings. Where damage has exposed steel, inspect it and reinstate the appropriate coating layers.

Acceptance of appearance, film thickness and local details

Distinguish the dry film thickness of an individual coat from the total system thickness and the thickness of retained paint. Where paint is retained, agree before work starts how to establish its baseline and verify the added thickness. ISO 19840:2012 applies to verification of nominal dry film thicknesses of 40 µm or greater on rough surfaces. When the gauge has been adjusted on smooth, flat steel, use the appropriate specified correction on rough steel to obtain the dry film thickness above the peaks of its surface profile. Keep the measurement areas, original readings, basis for correction and acceptance results. [7]

The public N500 TDS distinguishes the film thickness at the reference application rate from the design basis for total system thickness. Specify the target and permitted range for the primer and each topcoat. [2][7] If a notched gauge is specified, estimate wet film thickness during application under ASTM D4414-25 and adjust application as needed. When estimating dry film from wet film, use the volume solids of the material as mixed for application and account for any approved thinner. Wet film estimates support process control. For acceptance, measure the cured dry film and apply the project criteria. Inspect welds, edges, joints and repairs separately as agreed. ASTM D4414-25 description (store.astm.org) ISO 2808:2019 summary (iso.org)

Linking thickness readings and repairs to individual components

Where paint will be retained, establish a thickness baseline before application and record locations that can be identified again. Remeasure after completion using the project-approved method and state which layers the readings include. If the existing thickness varies or test points cannot be relocated reliably, agree in advance on staged measurements, representative test patches or another verification method. Record bare-steel and retained-paint areas separately. Combining their readings can obscure whether the new coating meets its thickness requirement.

Mark areas with low readings and confirm the conditions for recoating or repair. Where the film is locally too thick, also inspect sagging, cure and intercoat condition. Use the project documents to decide what action is needed. Reinspect the relevant items after each repair. For handover, the owner can use a component drawing to connect surface preparation, each coat, thickness readings and repair records, allowing corrosion or damage to be traced on later inspections. [6][7]

Worked example: Sound paint on a support with rust near the welds

Suppose the existing paint on the broad faces of outdoor steel supports is sound but paint is peeling and rust is visible near the welds. Mark potential retention areas separately from local repair areas. Inspect along corrosion boundaries for further spread beneath the paint. After cleaning, apply the proposed system to a test patch covering bare steel, retained paint and the transition. If the paint wrinkles, suspend work on areas with that condition. Once the patch is accepted, confirm local weld preparation and the primer system, apply the coating as specified, then reinspect coverage at the transitions and around the welds. Site inspection determines the repair scope for an actual project.

Start-up and acceptance checklist

Table 2
Stage Conditions for release Records to keep
Survey and test patches Exposure, areas of paint retention or removal and coating system confirmed Component IDs, area map, test-patch records
Release of prepared steel Cleaning, rust removal, specified roughness and other project requirements met Surface preparation, inspection locations, photographs
Primer and details Primer compatibility, coverage at details and readiness to recoat confirmed Primer batch, application times, detail photographs
N500 application Supplied label matches the plan, each coat is continuous and application is within the specified window Weights, environmental conditions, batches, quantities applied and times
Handover Appearance, dry film thickness and repair reinspection meet project requirements Measurement areas, original readings, repair and acceptance records

References

[1] Shenzhen Gaodun New Materials Co., Ltd., *Gaodun N500 Polyaspartic Polyurea Anticorrosive Coating*. Public product page, undated. Consulted for intended use on 2026-11-06. Source (gao-dun.com)

[2] Shenzhen Gaodun New Materials Co., Ltd., *Gaodun N500 Polyaspartic Polyurea Heavy-Duty Anticorrosive Coating Technical Data Sheet*, public mobile edition. See “Typical Technical Properties” and “Application System” for the reference application rate, film thickness, coating system and test-patch requirements. Verify the mixing ratio and application parameters for each coat against the project documents and documents for the material supplied. N500 public TDS (gao-dun.com)

[3] ISO 12944-2:2017, *Paints and varnishes — Corrosion protection of steel structures by protective paint systems — Part 2: Classification of environments*, second edition, 2017. Public scope consulted. Source (committee.iso.org)

[4] ISO 12944-4:2017, *Paints and varnishes — Corrosion protection of steel structures by protective paint systems — Part 4: Types of surface and surface preparation*, second edition, 2017. Public summary consulted. Source (iso.org)

[5] ISO 8501-2:1994, *Preparation of steel substrates before application of paints and related products — Visual assessment of surface cleanliness — Part 2: Preparation grades of previously coated steel substrates after localized removal of previous coatings*, first edition, 1994. Public summary consulted. Source (committee.iso.org)

[6] ISO 12944-7:2017, *Paints and varnishes — Corrosion protection of steel structures by protective paint systems — Part 7: Execution and supervision of paint work*, second edition, 2017. See the ISO summary (iso.org) and, for stripe coating, the SIST standard preview (preview.sist.si).

[7] ISO 19840:2012, *Paints and varnishes — Corrosion protection of steel structures by protective paint systems — Measurement of, and acceptance criteria for, the thickness of dry films on rough surfaces*, second edition, 2012. See the introduction and scope in the official preview (iso.org).

[8] ISO 8502-4:2017, *Preparation of steel substrates before application of paints and related products — Tests for the assessment of surface cleanliness — Part 4: Guidance on the estimation of the probability of condensation prior to paint application*, second edition, 2017. Public summary consulted. Source (iso.org)