Refurbishing an Existing Tiled Terrace Without Removing All Tiles: Which Areas Must Be Repaired First?

When refurbishing an existing tiled terrace with Gaodun polyaspartic coating, sound, clean and dry tiles may be retained after a compatible site trial passes. Loose, lifted or moving tiles require removal and repair. Unusual tapping sounds require reassessment and, where necessary, local opening-up. Suspend general coating if widespread instability, persistent dampness, water entry at thresholds, reverse drainage slopes or moving cracks remain unresolved. This guide explains how to map retained, repair and investigation zones, inspect transitions, thresholds and drains, and determine readiness for general coating. A work-start and acceptance checklist helps owners verify the repair scope in the quotation.

Article contents (9 sections)

Retaining Existing Terrace Tiles: Which Areas Must Be Removed and Repaired First?

When refurbishing an existing tiled terrace with Gaodun polyaspartic coating, retain the tiles only if the surface and underlying layers are stable, drainage and terminations can be addressed, and a compatibility trial on the actual tiles passes. Loose, lifted or moving tiles, and areas confirmed by opening-up to have lost adhesion or developed friable underlying material, should be removed back to a sound substrate and repaired. Mark and reassess areas that only produce an unusual tapping sound. Suspend general coating if persistent dampness, moving cracks, a pronounced reverse slope or an unidentified source of water at details remains unresolved.

Gaodun's site assessment focuses on whether the complete existing build-up can be retained. Even after a new coating adheres to the tile surface, the tiles, adhesive layer and substrate beneath it must provide stable support. Repair the affected layer when the problem lies below the tiles. Where a drain or threshold must be opened, define the removal area by what is needed to identify the construction, complete the termination and restore drainage.

Table 1
Site finding Treatment zone Condition for proceeding
Sound tiles and stable joints; no persistent dampness; drainage and terminations can be addressed Retain Cleaning, drying and the compatibility trial have passed
A small number of loose, lifted, damaged or unstable tiles, with surrounding substrate confirmed sound Local removal and repair Remove to sound boundaries; repaired areas meet subsequent coating requirements
Unusual tapping sound without tile movement; underlying condition unknown Investigate Reassess surrounding and adjacent tiles; open representative areas if necessary, then redefine the zone
Widespread instability, persistent water beneath tiles, moving cracks or drainage details that cannot be treated Suspend work Establish the water source and construction problem; confirm a repair or replacement waterproofing design

Before Work: Map the Zones, Then Define Repair Boundaries

Mark thresholds, wall junctions, drains, pipe penetrations, previous repairs and signs of leakage on one plan. Ask when water marks appear, whether they occur only after wind-driven rain and whether washing the terrace also causes them. Marks in the room below are investigative clues; identify the actual entry point by checking drainage paths, door/window interfaces and the construction. Where damp marks are pronounced inside a threshold, first inspect door-frame and wall-junction terminations and whether low spots direct rainwater toward the doorway.

Inspect each zone visually and by gentle tapping, recording the extent of unusual sounds. Then check for open cracks, lifting, movement underfoot, water emerging along joints and friable old grout. An unusual sound is a screening clue only. Select representative openings at the most pronounced anomaly, its boundary or a nearby detail. The site supervisor and owner should confirm the location, repair boundary and temporary rain protection. After opening, record tile-bed adhesion, friability of repair layers, underlying moisture and the stability of adjacent tiles.

Also check the effective drain opening, surface flow direction and existing depressions. Where feasible, observe actual flow under a site-specific plan while protecting the interior and the space below. Address drains above ponding areas, thresholds without workable termination space and continuing water entry through walls or door frames before coating. For work forming part of a building roof, drainage, waterproofing details and acceptance must also follow the applicable standard and project design.[1]

System and Materials: Confirm Tile Conditions Before Selecting N300 or N700

For primary waterproofing on concrete or tiled roofs and terraces, prefer N300 for prolonged outdoor exposure. Consider N700 for standard weathering requirements. Before retaining old tiles, check for hollow areas, loose tiles and contamination. Prepare a sound, clean, dry surface and verify adhesion of the proposed system on a trial area. Both public Gaodun product pages list tile-surface refurbishment. Confirm the actual tile type, compatible preparation, application method and working window against the selected grade's technical documents and the site method statement.[2][3]

Consider direct coating only after confirming that the existing tiles and underlying layers are sound, the tile surface is clean and dry, hollow or loose areas and contamination have been addressed, and adhesion of the proposed system has been verified on the actual tile surface. For smooth glazed tiles, waxed tiles or tiles treated with protective agents, first verify contaminant removal and actual wetting. Determine mechanical preparation or interface materials from the product documents and trial. The dilution procedure for a first penetrating/sealing coat on concrete does not apply to retained tile surfaces. The system schedule should identify repair material, joint materials, the main waterproofing layer and any required trafficable finish, and verify their compatibility.

Application Steps: What to Check After Each Stage

Step 1: Carry out local removal and repair. Remove confirmed loose or unstable tiles and underlying loose layers, retaining adjacent areas that have been reassessed as sound. Inspect the exposed cross-section and neighboring tile edges; record whether separation occurred beneath the tile, in the adhesive or in a repair layer. If continuous friability, marked underlying dampness or water entering from one side remains, do not seal the opening: reassess the water source and repair extent. If existing waterproofing is disturbed, first establish how continuity with surrounding waterproofing will be restored.

Step 2: Repair, level and prepare the tile surface. Remove dust, oil, adhesive residues and loose grout, then repair defects under the agreed method. Check that tile edges and joints are secure, repaired areas have reached the specified curing state and transitions have no sharp edges. Recheck surface flow direction. Suspend trial coating and reassess if repair material is not ready for overcoating, joints continue to release water, condensation is present or residues cannot be removed.

Step 3: Prepare a representative trial. Use the proposed N300 or N700 and the actual accompanying materials across original tiles, ordinary joints and repair transitions. Record component-measurement basis, batches, application and curing conditions under the relevant documents. At the specified inspection stage, check for cratering, blisters, tackiness, lifted edges and abnormal color differences. If adhesion testing is required, agree the method, locations, acceptance criteria and subsequent repairs beforehand. Record whether failure occurs in the coating, at the tile surface or beneath the tile. If the trial does not meet the project criteria, revise preparation or the system and repeat it.

Step 4: Complete the details before the general area. Treat thresholds, wall junctions, drains, pipe penetrations and joints that must accommodate movement under the agreed detail design. Photograph them before subsequent coats conceal them; check connections, secure edges and drain openings. Stop at the detail stage and review the design if a reliable threshold termination cannot be formed, a drain has been raised or joints continue to open and close. Only after details and their continuity are confirmed should successive general coats be applied under the grade documents and project method, checking batches, site conditions, consumption, thickness control and recoating state at each stage.[1]

Acceptance: Record the Repairs and Check Where Water Flows

Inspect concealed work before repaired areas and details are covered. The site records should locate removal boundaries, opening-up cross-sections, repair layers, drains and threshold details against the zone plan. On completion, check continuity of the main coating and terminations, missed areas, pinholes, blisters and local uncured material. Verify film thickness and drainage by the agreed methods. Terraces with regular pedestrian use also require separate checks of trafficability and wet slip-resistance requirements.

Check waterproofing function under the applicable standard and project plan after the coating reaches the required cure. If ponding is specified, first confirm load capacity, water retention and overflow, interior protection and post-test drainage. Record functional testing and drainage checks separately. Mark leaks or ponding locations, reassess the relevant construction, repair and retest under the plan.[1]

Common Defects: Identify Which Layer Has Failed Before Rework

If the coating lifts with an entire old tile, first inspect the tile-to-adhesive and adhesive-to-substrate interfaces and reassess the extent of neighboring tiles to be retained. If the tile is sound but the coating peels from its surface, investigate wax, oil, preparation and system compatibility. If water repeatedly emerges from joints or wall junctions after rain, investigate incoming water and trapped water below the tiles first. Cracks limited to repair transitions require checks of repair-layer soundness, curing and continuing movement at the interface.

Consider a simulated doorway-leak scenario: most tiles are sound, two tiles beside the threshold are loose and the drain edge is damp. Gaodun recommends classifying the loose threshold tiles for removal and the damp drain area for investigation. Establish the door-frame termination and the source of water beneath the tiles before deciding whether repairs can remain local to the details. If opening-up reveals dampness and loose layers extending into the general area, redraw the boundaries and confirm readiness only after drainage, substrate and trial checks have passed.

Before Signing the Work Order, List Retained, Repair and Investigation Areas Separately

The quotation can separately list general cleaning and coating, confirmed local removal and repair, threshold and drain treatment, and work that can only be established after opening-up. Agree who will reassess investigation zones and how additional scope will be confirmed if wet or loose layers are found. Before work, the supervisor should reconcile the zone plan with the quotation so that retaining the main tiled area is not interpreted as permission to coat directly over every detail. Mark any added area on the plan, then have the relevant project parties confirm its treatment and reinspection points.

Start-of-Work and Acceptance Checklist

Table 2
Swipe to see more columns
Inspection stage Item to verify Release condition or site action Records to retain
Before work Existing tiles and underlying layers Retained areas stable; anomalies reassessed; removal boundaries confirmed Zone plan; tapping survey or opening-up photographs
Before closing repairs Loose layers and water source Work reaches sound boundaries; persistent incoming water investigated and treated Cross-section photographs; before/after repair photographs
Before trial coating Grade, system and substrate Documents match the grade; tile and repair areas meet application conditions Product labels; document versions; substrate checks
Before general application Trial and details Trial meets project criteria; continuous terminations possible at thresholds, wall junctions and drains Trial records; photographs of concealed details
After completion Coating, drainage and function Appearance and thickness meet the plan; drainage and waterproofing function checked as required Zone acceptance; measurement points; retest records

References

[1] Ministry of Housing and Urban-Rural Development of the People's Republic of China: General Code for Waterproofing of Building and Municipal Engineering, GB 55030—2022; effective 1 April 2023. See the building-roof and acceptance provisions, within the code's scope. The original is attached to the announcement page. Accessed: 2026-11-06. Source (mohurd.gov.cn)

[2] Shenzhen Gaodun New Materials Co., Ltd.: Gaodun Polyaspartic Waterproofing Coating N300, public product page; no version date stated. Used to check the publicly listed substrates. Accessed: 2026-11-06. Source (gao-dun.com)

[3] Shenzhen Gaodun New Materials Co., Ltd.: Gaodun Polyaspartic Waterproofing Coating N700, public product page; no version date stated. Used to check the publicly listed substrates. Accessed: 2026-11-06. Source (gao-dun.com)