Can Polyaspartic Polyurea Be Applied after Rain? Assessing Summer Sun, Winter Cold and Curing before Rainfall

The roof looks dry after the rain stops. Can I paint polyaspartic polyurea immediately? Since it dries faster in summer, is the construction more reliable? How long does it take to get wet in winter? Gaodun believes that to judge the timing of construction, it is necessary to look at the curing characteristics of the product, the moisture content of the substrate, the temperature of the material and substrate, the condensation conditions and the subsequent curing weather. This article explains from five aspects why the decision to start construction cannot be based solely on weather forecasts or surface feel. If it rains in advance after construction, it is not advisable to judge all the work as scrapped, or to think that it must be qualified if there are no scratches on the surface. The model, painting and rain time, on-site temperature and surface changes should be recorded, and the supplier will determine whether inspection, repair or re-inspection is needed based on the degree of curing.

Article contents (7 sections)

1. What the curing reaction determines: Two-component does not mean that it is not affected by weather

Polyaspartic polyurea film formation occurs through the reaction of the reactive groups in the resin with the isocyanate group. Compared with materials that mainly rely on water evaporation for film formation, their film formation mechanism has different characteristics, but this does not mean that temperature and moisture no longer affect construction.

In Gaodun's two-component formulation, Part A is the corresponding isocyanate prepolymer or curing agent component, and Part B is the polyaspartic ester resin component. The structure and ratio of the two components determine the basic reaction characteristics, while the construction environment affects the actual viscosity, operating time and curing process.

Before construction, the allowed material temperature, air temperature, substrate temperature and humidity of the model should be confirmed with the supplier, and the pot life under corresponding conditions should be checked.

Air humidity and liquid water should also be distinguished. Humidity may affect the cure rate of some formulations, but surface water, dew, or moist interfaces cannot therefore be considered an advantage. Side reactions between isocyanates and water may produce carbon dioxide, which may affect film formation under inappropriate conditions.

Gaodun believes that formula development should take into account both the construction window and final performance. When consumers purchase, they should confirm the temperature and humidity conditions of the corresponding model instead of using the parameters of other brands or other models.

2. Why can’t we just look at the surface after the rain stops? The moisture content of the substrate needs to be judged individually.

The most common misjudgment after rain is to mistake "no open water" for "substrate has met construction requirements."

Concrete, mortar, tile joints and previously repaired areas absorb and dry at different rates. The surface has become lighter due to sunlight, but the interior may still contain more moisture; the surface of the tile is dry, and the gaps and underlying structures may not be dry yet.

This moisture may affect the interface bonding, or participate in problems such as blistering and delamination during subsequent temperature changes. Therefore, it is not appropriate to make a unified promise that "the cleaning will be possible after the rain stops in a few hours", nor should it be based on the number of consecutive sunny days as the only basis for judgment.

Table 1
Site status What can be explained What else do I need to confirm?
No standing water No clear water visible on the surface Pores, crevices and internal moisture
Not wet to touch There is no obvious water feeling in the contact area for the time being. Whether it meets the corresponding substrate requirements
sunbaked went through a surface drying process Are the shaded surface, wall root and repair area consistent?
Local moisture detection Provide information about the method and location Method applicability and point representativeness
Water found under old layer There is a hidden water problem Source, scope and cleanup repair needs

Water content detection cannot be separated from method interpretation. Mass moisture content, internal relative humidity and readings from different instruments cannot be directly interchanged. When a certain limit value is given in the product documentation, the measurement method and applicable substrate should be confirmed at the same time.

Gaodun suggested that inspections after rain should cover humid areas, wall roots, drainage outlets and the junctions of different materials. When there is continuous water seepage or water accumulation under the old layer, the source should be dealt with first, and the problem should not be determined after directly sealing it with a layer of quick-curing material.

3. How to arrange summer and winter: it depends on three temperatures, not just the temperature

Construction needs to distinguish between air temperature, substrate temperature and material temperature.

Before coating a roof, measure and record the substrate surface temperature and the air temperature at the work area. Check both against the application conditions in the current TDS for the model. If evening cooling is forecast, also check the curing conditions required after application. A forecast air temperature cannot replace a surface measurement.

Summer: Drying faster does not mean construction is easier

Increased temperature generally changes viscosity and speeds up reactions, shortening potable time. If the mixing volume is too large and the material is left in the barrel for a long time, the operating time may be further shortened due to the heat generated by the reaction.

If roller coating and edge joining have not yet been completed, the material will have thickened significantly, which may affect leveling, coverage, and intercoat quality. At this time, you should not add water, add curing agent or use thinner from unknown sources to "restore" without authorization.

During exposure, the material and substrate temperatures should be measured, and then the batch ingredients and construction period should be adjusted according to the model data.

Applicable practices include storing materials according to documented requirements, controlling the mixing volume of each batch, and selecting a time period when substrate conditions are appropriate. We cannot simply stipulate "brush at night in summer" because condensation may occur at night.

Winter: It can be cured at low temperature, but you need to give it enough time

For low-temperature construction, the allowable starting conditions, inter-layer recoat window and open use requirements should be checked separately, and the data of the model used at the corresponding temperature shall prevail.

Therefore, "products capable of low-temperature construction" must correspond to the minimum material temperature, substrate conditions and curing requirements. The recoating time under normal temperature conditions cannot be copied unchanged in winter.

Gaodun advocates that construction should be organized according to specific models and actual measurements; when adjustments are needed, the compatible system method verified by the manufacturer should be used to avoid changing the ratio of Part A and Part B on site.

4. Why there will be problems even if it doesn’t rain: The dew point determines whether condensation is possible

Dew comes from water vapor in the air. Condensation may appear on the substrate or uncured coating as the surface cools to appropriate conditions, even in the absence of rainfall.

This type of situation is especially worthy of attention in the early morning, evening, when the humidity is high or the temperature difference is obvious. No water droplets are visible to the naked eye, and there is no guarantee that the entire construction and early curing process will be free of condensation.

Combine the air temperature, relative humidity and substrate temperature to determine the risk of condensation, and confirm with the supplier the dew point temperature difference required for the model used.

The specific temperature difference and control period should be based on the corresponding product documents. The requirements of a certain product cannot be directly turned into unified parameters for all Gaodun models.

It is not necessary for consumers to have all the calculation details, but they can ask the builder to record these conditions. After it stops raining, is cloudy, moves to a shady area, or cools down in the evening, re-inspection should be carried out based on changes, rather than just one test and construction throughout the day.

5. How long does it take to be exposed to rain after painting: separate the operation, recoating and water exposure times.

"Dry" may at least involve the different stages of surface drying, allowing recoating, allowing walking, allowing water to be received, and reaching full performance.

Among them, the operable time in the barrel tells the construction personnel when the use needs to be completed; the recoating interval determines the timing of the next construction; the allowable water time is related to rainfall or water inspection. They cannot replace each other.

Table 2
time or condition Main purpose What this information alone cannot establish
Working time after mixing Arrange ingredients and coating Not established by this evidence alone: It will be completely cured after this time.
surface dry time Determine preliminary surface condition Not established by this evidence alone: Can be soaked in water for a long time or closed in water
Recoat interval Arrange the next construction project Not established by this evidence alone: Re-coating at any time can ensure the bonding between layers.
Rain allowed conditions Schedule outdoor weather windows Not established by this evidence alone: Already ready for long-term immersion in water
Complete curing requirements Return to prescribed use Not established by this evidence alone: Withstands all loads and chemical effects

Before construction, each process should be considered together with the weather required for early curing. Being able to complete the painting on the same day does not mean that the subsequent environment will definitely meet the requirements. When rainfall, condensation or significant cooling is forecast, you should confirm whether a corresponding window can be left.

If it rains in advance after construction, it is not advisable to judge all the work as scrapped, or to think that it must be qualified if there are no scratches on the surface. The model, painting and rain time, on-site temperature and surface changes should be recorded, and the supplier will determine whether inspection, repair or re-inspection is needed based on the degree of curing.

Before purchasing, consumers can ask the manufacturer five things: how to confirm the substrate conditions after rain, how to control the dosage of each batch in summer, how to adjust curing at low temperatures, whether it is necessary to record the dew point, and how long it will take to be exposed to rain and resume use.

Gaodun believes that reliable fast-curing technology should provide both a clear construction window and applicable conditions. The goal of research and development is to make materials form stable properties within the specified range and to help customers use them correctly through system documentations.

The appropriate construction timing should be determined by the corresponding product requirements, on-site substrate status and subsequent curing conditions. Confirming these conditions in advance is more helpful in reducing rework than simply waiting for "a sunny day".

Note: The specific temperature, humidity, water content and rain time are based on the corresponding product documents and engineering plans.

How to check concrete substrate moisture

The plastic film method of ASTM D4263-24 is used to indicate signs of capillary water in concrete. Even if there is no trace of water under the film somewhere after rain, the water content, condensation, temperature and humidity conditions should be checked according to the TDS of the model used and the project requirements before deciding on the start time. [1]

References

[1] ASTM International: "ASTM D4263-24 — Standard Practice for Indicating Moisture in Concrete by the Plastic Sheet Method", 2024 edition. See the official public scope of application. Source (store.astm.org)