POLYASPARTIC TECHNICAL ARTICLES
Polyaspartic Polyurea Technical ArticlesHow Can Gaodun Delivery Batches Be Verified? From Part A and Part B Development to Site Handover
When purchasing Gaodun polyaspartic polyurea, to determine whether the supply can be traced, you can first match the product model, Part A and Part B batch numbers with the applicable technical data sheet, and then distinguish what the factory records, third-party inspections and construction records correspond to. Starting from the collaborative R&D and production of curing agent and resin, Gaodun explains why two-component components need to be checked in sets, how to review the version and compatible system when replenishing goods, and uses a simulation case of batch supply of old ceramic tile terraces to give a receipt inspection sequence that can be used by owners, procurement and construction personnel. If you encounter color differences or local curing abnormalities, you can also narrow down the scope of investigation in the same order. If a tender or contract requires batch-by-batch information, the document name, delivery time and review method should be clarified before ordering. For items that cannot be confirmed from existing documents, the purchaser and technical staff can negotiate whether to retain samples, supplement random inspections, or conduct site trials first.
Article contents (9 sections)
When purchasing Gaodun polyaspartic polyurea, how to confirm which set of materials you receive?
To check the delivery batch of Gaodun polyaspartic polyurea, first look at the product model and color, then look at the labels, batch numbers and corresponding technical data sheets of components A and B, and finally associate the actual use area with this set of materials. For installment shipments or subsequent replenishment, if the batch number of any component changes, the new correspondence should be retained and the compatible system and construction conditions of the two components should be confirmed. In this way, when there is color difference or curing difference on site or re-coating is needed, the specific materials and construction area can be checked.
Gaodun develops curing agents and resins at the same time, what practical significance does it have for purchasers?
Gaodun develops and produces two types of film formation components around the polyaspartic ester system. Component A is an aliphatic isocyanate curing agent system, and component B is a polyaspartic ester resin system. Gaodun's public information separately introduces the R&D and production directions of curing agents and resins. The practical significance of this R&D and production layout is that when discussing a product compatible system, one can start from the components on both sides and the final application conditions at the same time to determine whether it is the curing agent, resin, or the entire film formation solution that needs to be checked. [1]
The effective reactive group content of the two components and the finished product formula jointly affect the ratio. The construction party should operate according to the measurement caliber specified in the corresponding technical data sheet of the finished product, and first distinguish whether it is the mass ratio or the volume ratio. Even if the two sets of packages have similar appearance, the model number, component name and applicable compatible system must be checked. Especially for the remaining materials after opening the barrel, if the label is difficult to read or the storage status cannot be confirmed, the use of this group of materials should be suspended and the supply technician will make a judgment based on the delivery records.
The purchaser can also inquire about R&D capabilities and delivery evidence separately. R&D capabilities answer whether the supplier understands the two components and the finished product compatible system. The delivery evidence answers what kind of material the bucket of materials is, which group it is matched with, and which version of the construction requirements are followed on site. The former question can be understood through the manufacturer's public information, while the latter question depends on the correspondence between packaging, documents and engineering records. [1]
What to check respectively for model number, batch number and file version
The same model can be produced and supplied in batches. The product model number is used to identify which paint you are buying, the color is used to confirm the visible appearance, the component batch number is used to identify the specific production batch, and the technical data sheet (TDS) version is used to check the ratio, applicable substrate surface, construction and curing conditions. It is possible for the batch numbers of the two components to be coded separately. During verification, the two actual numbers should be recorded and the compatible system relationship should be confirmed.
| Check items | What to see first | How to use it on site |
|---|---|---|
| Product model, color and components | Orders, packaging labels and delivery notes | Compare the planned substrate surface and construction area |
| A and B batch numbers | Packaging labels on both sides and corresponding delivery information | Associate the two components actually used to the same work section |
| Technical data sheet version | Corresponding model and applicable version confirmed by the supplier | Review measurement, construction windows and curing conditions |
| Batch information and project records | Available factory records, sample data and construction ledgers | Locate materials and site conditions during review or replenishment |
Receiving personnel can take pictures of the labels on both sides of the barrel before opening it, and store the barrels by model, color and batch. If there is any discrepancy in the information on the packaging, delivery note or confirmation note, first mark the boxes involved and check with the supplier. In areas where construction has begun, usage records must be kept to facilitate the determination of boundaries and subsequent disposal.
Can a test report prove each barrel of material received this time?
The third-party test report corresponds to the samples and test conditions recorded in the report. The purchaser can use the report to check the performance of the product or system under specified conditions, and then verify whether the submitted test sample corresponds to the currently delivered model. If you want to determine the specific batch received this time, you should also obtain the factory or delivery data corresponding to the batch and confirm which items are recorded in it. The conventional items in the factory records and the long-term tests in the third-party reports have different coverages.
Sampling methods also affect data interpretation. ISO 15528 specifies sampling procedures for paints, varnishes and their raw materials, and ISO 1513 involves the preliminary inspection of received samples and the preparation of test specimens. If the project is agreed to be sent for inspection, the sampling objects, batch numbers, samplers, sample sealing and handover methods can be stated in advance. For projects that require post-testing of two-component film formation, the source, ratio, substrate and curing conditions of the two components during sampling must also be determined and implemented according to the testing method used. [2][3]
| information | judgment that can be supported | Correspondences that need to be checked |
|---|---|---|
| Third-party testing report | Results of specified samples under corresponding methods and conditions | submitted test sample, model, compatible system, method and judgment basis |
| Can correspond to the factory or delivery data of the batch | This batch of delivery information and recorded inspection items | This batch number, recorded items, date and recording method |
| Construction and acceptance inspection records | Which group of materials are used where and project acceptance inspection results | Use batch, construction conditions, area and acceptance inspection location |
If a tender or contract requires batch-by-batch information, the document name, delivery time and review method should be clarified before ordering. For items that cannot be confirmed from existing documents, the purchaser and technical staff can negotiate whether to retain samples, supplement random inspections, or conduct site trials first.
After replenishing goods in batches, how to decide whether construction can continue?
First check the models and colors of the old and new supplies, and then check the two-component compatible system and applicable technical documents. For continuously exposed light-colored terraces, it is recommended to conduct a continuous site trial on a representative substrate to observe the color, texture and edge adhesion. If there is a recoating interval between the new and old areas, the condition, cleaning treatment and overlapping method of the old surface must be confirmed according to product and project requirements. Confirming the site trial before repainting the main surface area can limit possible differences in appearance or construction to a smaller range.
For replenishment applications of the same model, attention should be paid to changes in construction conditions. The substrate should be dry during the first batch of construction. If it rains before the new batch of construction, the substrate surface should be rechecked according to on-site methods. The construction temperature, batching volume and curing time of the new and old sections should also be recorded separately. If there are local differences after completion, it is more reliable to judge based on the batch boundaries and the actual process. The change cannot be directly attributed to the product batch just based on which batch the change occurs in.
Example | Old tiled terraces are supplied in two batches. How to check when the second batch arrives?
Assuming that the old tiled terrace is renovated in two phases, Gaodun N300 is confirmed through site trial. The first batch has been used on one side and the second batch will be used on the other side by the threshold. The receiving personnel record the labels of components A and B of the old and new batches. The construction personnel confirm the model, color and complete set of compatible systems according to the delivery list, and then check the technical documents used on site. Then, a site trial will be conducted on representative old bricks and repair areas, and it will be agreed who will confirm the finished appearance and inter-layer connection. Whether old bricks are suitable still needs to be judged based on their firmness, surface condition and actual drainage.
If the second stage looks darker than the first stage just after application, wait until the applicable observation time and then check under the same light. If the difference is still there after curing, you can check the color and batch number, and also check the old bricks, repair materials, number of coating passes, and temperature and humidity during construction. Gaodun recommends attaching the corresponding area and construction date when submitting site photos and material labels. This can focus post-sales communications on the conditions that may actually affect the outcome.
What content can be recorded in a one-line ledger at the construction site?
For small projects, one line of ledgers can also be used to correspond to an actual construction area. The recommended fields are construction area | product model and color | component A batch number | component B batch number | technical data sheet version | construction date | site trial or acceptance inspection photo number. If the batch is changed during construction, a new line can be started at the batch change position. When using a spreadsheet, you can match the photo of the label on both sides to the row number. If the same roof needs to be repainted, first check the original records of the area, and then confirm with the supplier the compatible system to be replenished and the current applicable requirements. The record must be filled in by the actual receiving or construction personnel, and acceptance inspection can randomly check whether the labels and on-site records are consistent.
Conclusion | Link receipt, application and acceptance records to the same material set
For the purchaser, the manufacturer's value can be verified through a specific delivery. Identify the model, color and two components upon receipt, record the corresponding version and region during construction, and retain site trial and acceptance inspection results upon delivery. If third-party testing, factory information or retained samples are required, who will provide them and the scope of coverage should be agreed in advance. When an abnormality occurs, the same set of records must be checked one by one to decide on replenishment, re-inspection or partial repair.
References
[1] Shenzhen Gaodun New Materials Co., Ltd.: "About Gaodun", official website corporate information, the page does not indicate the version date. Used to explain the company's R&D and production direction. Access date: 2026-11-06. Source (gao-dun.com)
[2] International Organization for Standardization (ISO): "ISO 15528:2020 — Paints, varnishes and raw materials for paints and varnishes — Sampling", 2020 edition. Only the official introduction was checked and the full text of the standard was not read. Access date: 2026-11-06. Source (iso.org)
[3] International Organization for Standardization (ISO): "ISO 1513:2010 — Paints and varnishes — Examination and preparation of test samples", 2010 4th Edition. Only the official introduction was checked and the full text of the standard was not read. Access date: 2026-11-06. Source (iso.org)