POLYASPARTIC TECHNICAL ARTICLES

Polyaspartic Polyurea Technical Articles

Why Do Polyaspartic Polyurea Prices Vary So Much? Comparing Cost per Square Meter

To compare installed cost per square metre, use the same substrate, intended use, coating layers and target dry film thickness. Calculate each layer’s material consumption per square metre from the relevant product data, allow for losses and multiply by its unit price. Add surface preparation, detailing, labour and equipment. State what each quote includes.

Article contents (10 sections)

1. Answer first: How much does polyaspartic polyurea cost per square meter? Why is there no unified answer?

When consumers inquire about prices, they often encounter several quotation methods: per kilogram, per barrel, and per square meter. Even if both say "polyaspartic polyurea waterproof", the quotes may contain different content.

One report only reports the main surface coating material, the other includes substrate treatment, primer coat, crack reinforcement and labor; one is estimated based on a thinner coating, and the other is calculated based on a complete waterproofing plan. Putting these prices directly together can easily lead to wrong judgments.

There are also differences in the product uses of polyaspartic polyurea. Products used for clear topcoat, metal corrosion protection and flexible roof waterproofing cannot be identified as interchangeable based on the material name alone.

Gaodun suggests that before comparing prices, confirm the usage scenario, performance requirements, specified dry film thickness and construction scope. After the conditions are clear, it is possible to judge where one offer is more expensive and where another offer is less expensive.

2. Raw materials and formulas will affect the price, but the brand name cannot replace the evaluation of the finished product.

When requesting a kit price for a two-component polyaspartic coating, confirm the product model, whether the price includes both matched components A and B, and the net mass per kit. Check the current technical data sheet (TDS) for that model’s mixing ratio by mass and intended use. Pail count or weight alone does not establish the mixing ratio.

Before comparing two quotes for long-term outdoor exposure, identify the surface to be protected, exposure conditions, proposed coating models and dry film thickness of each layer. Check suitability evidence for the proposed system. Raw material names and price per kilogram alone cannot establish weathering performance or service life.

However, "raw materials are more expensive" does not mean "more suitable for any scene". Imported raw materials cannot independently prove the performance of finished products, and domestic raw materials cannot be judged as low quality based solely on their source.

For a filled coating quoted by mass, use the mixed product’s volume solids and density to estimate material consumption per square metre at the target dry film thickness. Neither the filler name nor solids by mass supplies the volume solids value. Ask the supplier for missing product-specific data.

Gaodun believes that the material costs paid by consumers should correspond to the performance evidence and applicable value of the specific model. Manufacturers need to explain product differences and provide data support.

3. Cheap per kilogram does not necessarily mean cheap per square meter

Roof waterproofing uses coating with a certain thickness. The unit price per kilogram only describes one dimension of the purchased materials.

How many kilograms are needed to form the same dry film thickness is also related to the density of the mixture, volume solid content and actual loss. High-density materials have a smaller volume per kilogram; when the volume solid content is lower, the volume of wet material required to form the specified dry film will also increase.

Hempel's public technical information relates the theoretical coating rate to volume solid content and dry film thickness, and makes it clear that the theoretical value is for a completely smooth surface. Hempel

Consumers do not necessarily need to complete all the calculations themselves, but they should ask the supplier to answer: What is the recommended dosage, what dry film thickness corresponds, and how the data is determined.

"One kilogram can brush a large main surface area." If there is no thickness prerequisite, it is not enough to prove the economy. The coverage area used for thin-layer topcoat cannot be directly used as the coverage area for waterproofing of the main roof.

4. Use a calculation example to understand the difference between kilogram price and film formation cost

For a continuous film formation layer, when using applicable mixture parameters and temporarily ignoring substrate absorption and construction loss, the following formula can be used to estimate the theoretical dosage:

Theoretical dosage (kg/square meter)≈dry film thickness (mm)×mixture density (kg/liter)÷volume solid content rate.

The volume solid content rate in the formula is substituted as a decimal, for example, 96% is calculated as 0.96. Mass solid content and volume solid content cannot be mixed directly; the density used for calculation should also be the data after mixing according to the specified proportion.

The following are purely teaching assumptions and do not represent Gaodun quotations or any actual brand parameters:

Table 1
Compare items Assumed option one Assumed option two
A+B mixture unit price 100 yuan/kg 120 yuan/kg
Mix density 1.40kg/liter 1.20kg/liter
Solid volume 80% 96%
Dry film thickness used for calculation 1.0 mm 1.0 mm
Worked example: theoretical consumption at 1.0 mm dry film thickness Option 1: density 1.40 kg/L, 80% solids by volume, theoretical consumption 1.75 kg/m² Option 2: density 1.20 kg/L, 96% solids by volume, theoretical consumption 1.25 kg/m²
The theoretical material cost of this layer 175 yuan/square meter 150 yuan/square meter

This calculation example shows that a solution with a higher kilogram price may have a lower film formation cost of the same thickness.

But this only compares the theoretical cost of one layer of material, and it has not been proven that the performance of the two solutions is equivalent. The 1.0 mm in the table is only a calculation condition and cannot be used as a thickness recommendation for all roofs. The selection still needs to meet the project requirements first and then compare the costs.

5. Why can’t the actual dosage usually directly copy the theoretical value?

The roof surface is not completely smooth. Rough pores, depressions, local repairs and coating thickness fluctuations will all affect actual consumption; tools, barrel wall residues and waste materials exceeding pot life will also increase losses.

Hempel's product data sheet notes that actual consumption is affected by factors such as substrate roughness, changes in construction film thickness, surface shape, and material loss; for materials used for absorbent substrate infiltration and sealing, the theoretical coating rate of continuous coatings cannot be directly applied. Hempel:Explanatory notes to product datasheets(2023) (hempel.com)。

Therefore, penetration sealing, leveling repair and surface waterproofing film formation should be calculated separately. The part that penetrates into the concrete cannot be fully included in the effective film thickness of the surface.

During construction, we cannot simply assume that “the thicker, the better”. Applying too much material in one coat can affect leveling, air release and curing. Follow the application requirements for each coat in the specific product’s instructions.

A reliable estimate should be based on local trial coating, actual area and details, and explain the dosage range and loss basis. For unclear old substrate surfaces, verifying them first and then quoting them is usually more helpful in controlling subsequent additions.

6. What might be saved by a low-price quote? Check the scope first before making a judgment

The low price may come from delivery efficiency, packaging specifications or project scale, or it may be because the quote only covers part of the work. You cannot judge authenticity or quality based on price alone.

What consumers need to check is whether the following content includes:

Table 2
Quotation items Issues that should be clarified
substrate processing Does it include sanding, cleaning, and removal of loose old layers?
Repair and leveling How to price cracks, holes and local defects
primer coat or seal Is it necessary? What are the materials and dosage?
main surface waterproof Model, dry film thickness, dosage and lane arrangement
details strengthen Are pipe roots, drain openings, internal and external corners and edges included?
Additional features How to achieve anti-slip, wear-resistant or decorative requirements
Delivery and after-sales How to agree on freight, labor, inspection and warranty responsibilities

The same approach isn't required for every roof, but each project should have a clear idea of what to do.

For an obviously low quotation, you can ask the supplier to clearly state the usage and scope; for a higher quotation, you should also ask for an explanation of what performance, work or service the increased cost corresponds to.

7. Why should the complete construction cost of polyaspartic polyurea be compared?

To compare installed cost per square metre, agree on the same substrate, scope and target dry film thickness. For each specified primer, main coat and topcoat, multiply the quantity required, including site losses, by its unit price. Add surface preparation, detailing, labour and equipment costs. Divide the total by the area covered by that quote.

According to Covestro's public information, some of its polyaspartic polyurea protection systems can improve construction efficiency by curing faster and reducing the number of coating passes. This reminds consumers that the economic value of coating technology can be reflected in the complete operation process. Covestro

However, the efficiency conclusion of the relevant industrial protection system cannot be directly converted into the saving ratio of all roof projects, nor can it be used to reduce the number of roof waterproofing arbitrarily.

It is equally important whether the construction window of a specific product is suitable for the site. If the material reacts too fast and exceeds the processing capacity of the operator, waste and defects may increase; only with a compatible system and reasonable organization can there be an opportunity to reduce rework.

When comparing plans, Gaodun attaches great importance to the matching of material performance and actual constructability. The quotation should be based on the workmanship that can be completed on site and explain the impact of weather, substrate and curing on arrangements.

8. How to calculate long-term value so that it will not be biased by "lifetime commitment"?

For roofs that have leaked, repair costs may include cleaning the old layer, reprocessing details, moving equipment and indoor damage. Therefore, a solution with a reliable and durable basis may be more valuable than simply lowering the initial price.

But long-term cost comparisons cannot treat unproven lifespans as firm numbers. For example, if you directly divide the price of a certain solution by the "determined twenty-year life span", if there is a lack of basis, the calculation result will be easily distorted.

A more prudent approach is to list the initial construction, inspection and maintenance, possible local repairs and renovation costs after clarifying the comparison period, and explain the assumptions of lifespan and maintenance frequency.

Different scenarios can be set up for the part where the evidence is insufficient, and predictions should not be stated as facts that have already happened. The scope of the warranty must also be checked separately to distinguish between material compensation, construction repairs and other losses.

What consumers really want is explainable risks and fees, not a seemingly low "average annual cost."

9. Gaodun’s price concept: let costs correspond to verifiable use value

Shenzhen Gaodun New Materials Co., Ltd. has been focusing on polyaspartic polyurea systems since 2016, focusing on R&D, synthesis and production of Part A and Part B.

From the perspective of R&D and production enterprises, reasonable prices need to support raw materials and compatible system control, production consistency, performance verification and technical services. Consumers should also be able to check what specific information, product performance and service content these inputs ultimately correspond to.

When purchasing, it is recommended to provide the supplier with the city, substrate surface type, area, old layer and leakage situation, obtain a clear description of the model, dosage, thickness and range, and then compare different options.

To determine whether polyaspartic polyurea is worth buying, you should first confirm that the performance matches the scene, and then compare the material cost and complete construction cost of the same thickness. The unit price per kilogram can help with inquiry, and a clear plan can help make a purchasing decision.

Further reading and technical information

The links below provide background on the topic. When it comes to specific performance, product selection or engineering parameters, please check the applicable objects and test conditions of each data.

The above original data is used to verify the corresponding technical principles, research formulas or construction examples, and is not the testing or certification of Gaodun products. Research conclusions should be understood together with formulas, specimens and test conditions; construction parameters of products from different manufacturers cannot be directly interchanged.